Handover and asset information

The longest phase of a building’s life is operation. BIM handover delivers the data owners need to run and maintain it — if it’s planned from the start.

In this lesson you will

  • Explain the asset information model
  • Understand COBie and classification
  • Plan data from early design
  • Verify handover information

From project to asset model

During design and construction the team builds a project information model. At handover, the relevant parts become the asset information model (AIM) — the information the owner needs to operate, maintain and eventually alter the asset, as set out in the Asset Information Requirements.

COBie and classification

COBie (Construction Operations Building information exchange) structures asset data in spreadsheet-like tables: facility, floors, spaces, zones, types, components, systems, spares, jobs and documents. Classification systems such as Uniclass or OmniClass give consistent codes so data can be filtered and linked to maintenance systems.

Plan early

Handover data is expensive if collected at the end. Agree which asset types need what data, which parameters carry it, who fills them in at which stage (designer: type and performance; contractor: manufacturer, serial numbers, installation dates), and how it will be checked.

Verify

Check handover data like any deliverable: completeness per asset type, consistent naming and classification, links to documents (manuals, warranties), and spot checks on site. Owners should test importing the data into their FM system before practical completion.

An example: one pump

For a circulating pump, the designer provides the type, duty (flow and head), power and system; the contractor adds manufacturer, model, serial number, installation date, warranty start and a link to the operation and maintenance manual; the facilities team adds its asset tag and maintenance schedule. In the model, these are parameters on the pump; in COBie, they fill the Type, Component and Document sheets. Checking that every pump has these fields filled — before handover — is a simple, high-value quality check.

Common mistakes

  • Collecting asset data only at practical completion.

    Assign data responsibilities at design stage and collect progressively during construction.

  • Delivering data the owner's system can't import.

    Agree formats and test an import with the facilities team early.

  • Inconsistent names and classifications.

    Use one classification system and naming convention throughout the model and documents.

Exercise

Handover data for a plant room

  1. List five asset types in a plant room (pumps, boilers, valves…).
  2. For each, write the data an FM team needs and who provides it.
  3. Choose a classification system and assign codes.

You should end up with: A handover data plan for a small area.

Checklist

0 of 4 checked · saved on this device

Lesson quiz

1 / 4

The asset information model is used mainly during…

Finished this lesson?

Taking the quiz marks it complete too. Your course page picks up where you stopped.

Free KitWren tools that help

Free, independent learning material written for KitWren. We never provide software downloads, licence keys or cracks — use the official sources.