Skip to content
KitWren
AdvancedFree Revit course about 22 min

Project organisation

As projects grow, organisation is what keeps them workable. Learn to structure the Project Browser, name views, handle existing vs new work with phases, and share models with worksharing.

In this lesson you will

  • Organise the Project Browser with parameters
  • Use phases for renovation projects
  • Use design options for alternatives
  • Understand worksharing and worksets

Browser organisation

Big projects have hundreds of views. Add a view parameter such as View Purpose (Working, Documentation, Presentation) and organise the browser by it (right-click Views › Browser Organization). Organise sheets by discipline or series. Name views predictably — L01 - GA Plan, L01 - RCP — and delete working views you no longer need.

Phases

For renovations, every element has a Phase Created and Phase Demolished. Model existing walls in Existing, demolish some in New Construction (Demolish tool), and add new walls in New Construction.

Each view has a Phase and a Phase Filter (e.g. Show Previous + Demo for a demolition plan, Show Complete for the proposed plan). Graphic overrides make demolished work dashed and new work bold — the standard look of renovation drawings.

Design options

Design Options keep alternatives in one model — kitchen layout A or B, two entrance designs. Create an option set, model each option, and show the chosen one in views. Accept the primary option when the client decides, to remove the others.

Worksharing

Teams work on one model through worksharing: a central model on a server or cloud service, and each person works in a local copy, using Synchronize with Central to publish and receive changes.

Worksets divide the model (Shell, Interiors, Furniture, Site, Links) for visibility control and to open large models partially. Elements are borrowed as you edit them; relinquish when you synchronise. Always create a new local copy each day rather than reusing an old one. Worksharing has not been available in Revit LT.

Quick reference

Command / toolHow to start itWhat it does
Browser OrganizationView › User InterfaceGroups and sorts the Project Browser
PhasesManage tabPhases, filters and overrides
DemolishModify tabDemolishes an element in the view's phase
Design OptionsManage tabAlternative designs
Synchronize with CentralCollaborate tabPublishes and gets changes

Common mistakes

  • New walls appear in the existing plan.

    Check the elements' Phase Created and the view's phase and filter.

  • Teammates overwrote each other's work.

    Use worksharing with a central model, not copies of one file.

Exercise

A small renovation

  1. Model an existing room in the Existing phase.
  2. In New Construction, demolish one wall and add a new opening and walls.
  3. Create an Existing plan (Show All in Existing), Demolition plan (Show Previous + Demo) and Proposed plan (Show Complete).
  4. Add design options for two kitchen layouts.

You should end up with: Three phase-based plans and two design options from one model.

Checklist

0 of 4 checked · saved on this device

Lesson quiz

1 / 4

Which phase filter shows existing work plus what's being demolished?

Finished this lesson?

Taking the quiz marks it complete too. Your course page picks up where you stopped.

Free KitWren tools that help

Free, independent learning material written for KitWren. Revit is a registered trademark of Autodesk, Inc. KitWren is not affiliated with, sponsored or endorsed by Autodesk. We never provide software downloads, licence keys or cracks — use the official sources.