Skip to content
KitWren
IntermediateFree Construction documentation course about 16 min

Specifications and notes

Specifications describe quality; drawings show quantity and location. Learn how specifications are organised and how to write drawing notes that support rather than contradict them.

In this lesson you will

  • Understand specification structure
  • Distinguish prescriptive and performance specifications
  • Write notes that don't duplicate or conflict
  • Use keynotes linked to specification sections

Specification structure

Specifications are organised by trade or system using a classification — e.g. MasterFormat in North America, NATSPEC in Australia, NBS in the UK. Each section typically covers general requirements, products (materials and standards) and execution (workmanship, tolerances, testing).

Prescriptive and performance

A prescriptive specification names exactly what to use ("90 mm MGP10 studs at 450 centres"). A performance specification states the result required ("wall system achieving FRL 60/60/60 and Rw 45") and lets the contractor propose a solution. Most projects mix both.

Notes on drawings

Drawing notes should identify what and where; the specification says what quality and how. Avoid long notes that repeat the specification — if either changes, they'll conflict. Use short, consistent labels, ideally keynotes coded to specification sections, with a general note stating how drawings and specification relate.

Avoid conflict

Common conflicts: a material named differently on drawings and in the specification; dimensions stated in notes and drawn differently; product names on drawings that the specification has since changed. A final cross-check between drawings and specification before issue catches most of them.

Common mistakes

  • Copying a previous project's specification without editing.

    Remove irrelevant clauses and check every product and standard referenced.

  • Naming a proprietary product on drawings and a different one in the specification.

    Choose one source for product selection — usually the specification — and reference it.

  • Notes that say 'or equal' with no criteria.

    State the performance a substitute must meet.

Exercise

Rewrite notes

  1. Take five long notes from a drawing (or write some).
  2. Rewrite each as a short keynote label with a specification reference.
  3. Write the specification clauses those notes relied on.

You should end up with: Short, coordinated notes backed by specification clauses.

Checklist

0 of 4 checked · saved on this device

Lesson quiz

1 / 4

A requirement stating the fire resistance the wall must achieve is…

Finished this lesson?

Taking the quiz marks it complete too. Your course page picks up where you stopped.

Free KitWren tools that help

Free, independent learning material written for KitWren. We never provide software downloads, licence keys or cracks — use the official sources.