Revisions and document control

Once documents are issued, every change must be controlled so everyone builds from the current version. Learn revision conventions, transmittals, RFIs and record keeping.

In this lesson you will

  • Apply revision codes and clouds
  • Issue documents with transmittals
  • Handle RFIs and their responses
  • Keep a reliable issue record

Revisions

Each change after issue gets a new revision (e.g. letters for preliminary issues P1, P2… and numbers or letters for construction issues C1, C2…, or A, B, C — follow your standard). Changes are clouded with a revision triangle, and the title block's revision table records the revision, date and description. Remove old clouds when issuing the next revision.

Status

Each issue states its purpose: For information, For comment, For approval, For tender, For construction. Under ISO 19650 national annexes, status codes (e.g. S1–S4 for shared, A-codes for authorised) describe suitability. Builders must build only from documents issued for construction.

Transmittals and registers

A transmittal records what was issued, to whom, when, why and at which revision. The register summarises the current revision of every drawing. On many projects a common data environment manages both automatically.

RFIs

A request for information is a contractor's formal question about the documents. Answer promptly and clearly, reference the drawings, and if the answer changes the design, issue revised documents — an RFI response shouldn't become a hidden design change. Track RFIs in a log.

Records

Keep every issued document, unchanged, in a dated archive. Mark superseded prints on site as superseded. At completion, compile as-built documents from the contractor's marked-up records.

Common mistakes

  • Answering RFIs with design changes by email only.

    Issue revised documents so everyone builds from the same information.

Exercise

Run an issue

  1. Issue three drawings at revision P1 For comment with a transmittal.
  2. Make changes to two, cloud them and issue P2.
  3. Write an RFI from a builder's point of view and your answer.
  4. Update the register.

You should end up with: A complete paper trail for two issues and an RFI.

Checklist

0 of 5 checked · saved on this device

Lesson quiz

1 / 4

What should builders build from?

Finished this lesson?

Taking the quiz marks it complete too. Your course page picks up where you stopped.

Free KitWren tools that help

Free, independent learning material written for KitWren. We never provide software downloads, licence keys or cracks — use the official sources.