Advanced
Construction documentation for advanced users
Revisions, transmittals and RFIs, and checking documents before issue.
2 lessons · about 0.6 hours · free
Control and quality
- 18 min
1. Revisions and document control
Once documents are issued, every change must be controlled so everyone builds from the current version. Learn revision conventions, transmittals, RFIs and record keeping.
- • Apply revision codes and clouds
- • Issue documents with transmittals
- • Handle RFIs and their responses
- 16 min
2. Checking and quality assurance
Errors in documents become costs on site. A disciplined checking process — self-check, peer check, coordination check — catches most of them before issue.
- • Run a systematic self-check
- • Organise peer and senior reviews
- • Check coordination between disciplines
Start with Revisions and document control Then: Practical projectsFull Construction documentation outline
Free, independent learning material written for KitWren. We never provide software downloads, licence keys or cracks — use the official sources.