Project: Run a coordination round
Act as BIM coordinator for one coordination round: federate the models, build sets, run focused clash tests, turn results into assigned issues and produce the meeting pack.
By the end of this project you will
- Federate and check models
- Build sets and a clash matrix
- Produce grouped, assigned issues
- Report clearly for a coordination meeting
Project brief
Objective
Deliver one complete coordination round: a federated NWF, search sets, clash tests, grouped issues, a short 4D check and a meeting pack.
The brief
Use architectural, structural and services models for a small building — your own Revit models (with some services modelled) or published sample models you're licensed to use. The team meets fortnightly; you must deliver a coordination pack two days before the meeting.
Step 1 — Federate
- 1Export NWCs from coordination views with shared coordinates.
- 2Append, check alignment and units, save the NWF.
- 3Save viewpoints for each level and key area.
Step 2 — Sets and tests
- 1Build search sets per discipline and system.
- 2Write a clash matrix (types, tolerances, priorities).
- 3Create tests and add rules to remove false positives.
Step 3 — Issues
- 1Run tests; group results into issues.
- 2Assign each to a discipline with a due date and a clear comment.
- 3Colour systems with the Appearance Profiler for issue images.
Step 4 — Sequence check and pack
- 1Create a simple TimeLiner sequence of the structure and major services to check one installation order.
- 2Publish an NWD snapshot.
- 3Write a two-page pack: summary, top issues with images, counts per test, decisions needed.
Deliverables
Hand in (or keep for your portfolio) the following. Each item maps to a checklist line below.
| Deliverable | Format | What it proves |
|---|---|---|
| Coordination NWF and published NWD | Navisworks files | Models federated and recorded |
| Search set library | XML export | Reusable, self-updating sets |
| Clash report | HTML/PDF | Grouped, assigned issues |
| Meeting pack | 2-page PDF | Clear actions and trends |
Common mistakes
Moving consultant models in Navisworks to make them line up.
Fix coordinates at export so every round aligns automatically.
Issuing hundreds of ungrouped clashes.
Group into issues with owners, viewpoints and due dates.
Forgetting to keep a record of each round.
Publish a dated NWD and report for every round.
Your task
Round two
- Fix three issues in the source models (or simulate fixes by moving elements).
- Re-export, refresh and re-run tests.
- Report which issues are resolved and what's new.
You should end up with: Evidence of the coordination cycle working.
Completion checklist
0 of 7 checked · saved on this device
Project quiz
Order the coordination round.
Finished this project?
Taking the quiz marks it complete too. Your course page picks up where you stopped.
Free KitWren tools that help
- Length ConverterConvert between metres, centimetres, millimetres, kilometres, inches, feet, yards and miles.
- Merge PDFCombine multiple PDFs into one file, in any order, choosing which pages to include from each.
- Image CompressorCompress JPG, PNG and WebP images to make them much smaller — with a before/after preview and the size saved.
- Working Days CalculatorCount business days between two dates, excluding weekends and your public holidays.
Free, independent learning material written for KitWren. Navisworks is a registered trademark of Autodesk, Inc. KitWren is not affiliated with, sponsored or endorsed by Autodesk. We never provide software downloads, licence keys or cracks — use the official sources.