Project: Run a coordination round

Act as BIM coordinator for one coordination round: federate the models, build sets, run focused clash tests, turn results into assigned issues and produce the meeting pack.

By the end of this project you will

  • Federate and check models
  • Build sets and a clash matrix
  • Produce grouped, assigned issues
  • Report clearly for a coordination meeting

Project brief

Objective

Deliver one complete coordination round: a federated NWF, search sets, clash tests, grouped issues, a short 4D check and a meeting pack.

The brief

Use architectural, structural and services models for a small building — your own Revit models (with some services modelled) or published sample models you're licensed to use. The team meets fortnightly; you must deliver a coordination pack two days before the meeting.

A duct from the mechanical model passing through a steel beam from the structural model, with the intersection highlighted as a hard clash.Steel beam (structural model)Duct (mechanical model)Hard clashtwo objects occupy the same space
Figure: A clash between two models. Original KitWren diagram.

Step 1 — Federate

  1. 1Export NWCs from coordination views with shared coordinates.
  2. 2Append, check alignment and units, save the NWF.
  3. 3Save viewpoints for each level and key area.

Step 2 — Sets and tests

  1. 1Build search sets per discipline and system.
  2. 2Write a clash matrix (types, tolerances, priorities).
  3. 3Create tests and add rules to remove false positives.

Step 3 — Issues

  1. 1Run tests; group results into issues.
  2. 2Assign each to a discipline with a due date and a clear comment.
  3. 3Colour systems with the Appearance Profiler for issue images.

Step 4 — Sequence check and pack

  1. 1Create a simple TimeLiner sequence of the structure and major services to check one installation order.
  2. 2Publish an NWD snapshot.
  3. 3Write a two-page pack: summary, top issues with images, counts per test, decisions needed.

Deliverables

Hand in (or keep for your portfolio) the following. Each item maps to a checklist line below.

DeliverableFormatWhat it proves
Coordination NWF and published NWDNavisworks filesModels federated and recorded
Search set libraryXML exportReusable, self-updating sets
Clash reportHTML/PDFGrouped, assigned issues
Meeting pack2-page PDFClear actions and trends

Common mistakes

  • Moving consultant models in Navisworks to make them line up.

    Fix coordinates at export so every round aligns automatically.

  • Issuing hundreds of ungrouped clashes.

    Group into issues with owners, viewpoints and due dates.

  • Forgetting to keep a record of each round.

    Publish a dated NWD and report for every round.

Your task

Round two

  1. Fix three issues in the source models (or simulate fixes by moving elements).
  2. Re-export, refresh and re-run tests.
  3. Report which issues are resolved and what's new.

You should end up with: Evidence of the coordination cycle working.

Completion checklist

0 of 7 checked · saved on this device

Project quiz

1 / 4

Order the coordination round.

Tap the words in order

Finished this project?

Taking the quiz marks it complete too. Your course page picks up where you stopped.

Free KitWren tools that help

Free, independent learning material written for KitWren. Navisworks is a registered trademark of Autodesk, Inc. KitWren is not affiliated with, sponsored or endorsed by Autodesk. We never provide software downloads, licence keys or cracks — use the official sources.