Project: Prepare a small documentation package
Produce a compact but complete package for a small building — the drawings, schedules, specification outline and issue records a builder could price and build from.
By the end of this project you will
- Plan and number a documentation set
- Produce the key drawing types to a consistent standard
- Coordinate drawings, schedules and specification
- Check, issue and revise the package
Project brief
Objective
Issue a checked, cross-referenced documentation package for a small building with register, transmittal and specification outline.
The brief
A small building such as a backyard studio, a garage with a workshop, or the house from the AutoCAD or Revit projects. Use any CAD or BIM software. The package should be enough for a builder to price the work.
Step 1 — Plan
- 1Write the sheet list: cover/register, site plan, floor plan, roof plan, elevations, two sections, wall section, three details, schedules.
- 2Set up title blocks with all fields and a revision table.
Step 2 — Drawings
- 1Produce each drawing to the checklists in the lessons.
- 2Cross-reference every section and detail.
- 3Schedule doors, windows and finishes.
Step 3 — Specification outline
- 1Write a one- or two-page outline specification by trade (e.g. concrete, framing, roofing, windows, linings, finishes).
- 2Key your drawing labels to its sections.
Step 4 — Check and issue
- 1Self-check with the pre-issue checklist; ask someone else to check.
- 2Issue revision P1 For tender with a transmittal and register.
- 3Answer one invented RFI with a revision P2 of the affected sheet.
Deliverables
Hand in (or keep for your portfolio) the following. Each item maps to a checklist line below.
| Deliverable | Format | What it proves |
|---|---|---|
| Drawing set with register | PDF set | Complete, numbered and cross-referenced |
| Schedules | Within the set | Tags and schedules match |
| Outline specification | 1–2 pages | Quality requirements are defined |
| Transmittal, RFI and revision | Document control works |
Common mistakes
Starting drawings before planning the sheet list.
List every sheet first so references and numbering are right from the start.
Details that aren't referenced from any plan or section.
Every detail needs at least one callout pointing to it.
Issuing without a transmittal.
Every issue needs a transmittal and an updated register.
Your task
Price test
- Ask someone (or yourself, pretending to be an estimator) to list quantities for three items from your drawings.
- Note anything they couldn't find or had to assume — those are documentation gaps.
You should end up with: Evidence the package is priceable.
Completion checklist
0 of 7 checked · saved on this device
Project quiz
Order the package workflow.
Finished this project?
Taking the quiz marks it complete too. Your course page picks up where you stopped.
Free KitWren tools that help
- Merge PDFCombine multiple PDFs into one file, in any order, choosing which pages to include from each.
- PDF CompressorReduce PDF file size by recompressing images while keeping text sharp — free, private and in your browser.
- Add Page Numbers to PDFNumber PDF pages with your choice of position, style and starting number.
- Watermark PDFStamp text like “CONFIDENTIAL” or “DRAFT” diagonally across PDF pages.
- Sign PDFSign a PDF online for free: draw, type or upload your signature, add initials and the date, and download the signed PDF.
- Length ConverterConvert between metres, centimetres, millimetres, kilometres, inches, feet, yards and miles.
Free, independent learning material written for KitWren. We never provide software downloads, licence keys or cracks — use the official sources.